Test Information:
Total Questions: 60
Test Number: HPE0-Y53
Vendor Name: HP
Cert Name: HP Master ASE
Test Name: Building HPE SDN and FlexNetwork Solutions
Official Site: http://www.certsgrade.com
For
More Details: http://www.certsgrade.com/pdf/hpe0-y53/
Version:
8.0
Question: 1
An
HP Comware switch is controlled by a team of HP VAN SDN Controllers. The
controllers have these roles within the region that contains the switch.
Controller
1 = Master
Controller
2 Primary slave
Controller
3 =Secondary slave
A
failed network connection causes Controller 1 to lose contact with the switch.
Controller 2 and Controller 3 can still reach all the controlled devices.
Controller 1 is still up and has contact with other controllers and switches.
How does the team handle this situation?
A.Controller
1, as master, contacts OpenFlow-enabled devices near the switch and attempts to
repair the connection.
B.Controller
2 becomes the master for this switch, although Controller 1 remains master for
other switches.
C. Controller 1, as master, removes the switch
from any active flows and sends updated flows to Controller 2 andController 3.
D.Controller
2 becomes the master for all switches in the region, and Controller 1 becomes
the primary slave for the region.
Answer: B
Question: 2
Refer
to Exhibits:
The
switch and server will transmit Fibre Channel over Ethernet (FCoE) traffic on
the Ethernet link. If congestion occurs, the devices should pause the
FCoEtransmissions rather than drop them. What must the network administrator do
on interface Ten-GigabitEthemet 1/0/2 to enable this behavior?
A.Enable
Enhanced Traffic Selection (ETS) TLVs.
B.Assign
the QoS policy as an inbound policy.
C. Set the priority flow control no-drop queue
to 802.1p3.
D.Configure
queue3 as a strict priority (sp or groupO) queue.
Answer: C
Question: 3
Which
technology is best suited for isolating tenants within a data center that must
support many tenants?
A.TRILL
B.MDC
C.
SPBM
D.
EVI
Answer: B
Question: 4
An
HP Comware switch has four MDCs defined on it. Network administrators need to
set up SSH access to each MDC and want to use the Management-Ethernet interface
for that purpose. What is a valid configuration?
A.The
same Management-Ethernet interface is assigned to each MDC. Each MDC assigns
the same IP address to this interface.
B.The
Management-Ethernet interface is divided into four subinterfaces, each of which
is assigned to an MDC. Each MDC assigns a different IP address to its
subinterface.
C. The same Management-Ethernet interface is assigned
to each MDC. Each MDC assigns a different IP address to this interface.
D.The
Management-Ethernet interface is divided into four subinterfaces, each of which
is assigned to an MDC. Each MDC assigns the same IP address to its
subinterface.
Answer: A
Question: 5
A
company has a data center, which hosts production services, as well as
development and quality assurance services. The network infrastructure for all
services should be isolated. The company also needs a highly available,
resilient large Layer 2 network for each set of services.
What
are two technologies that could be combined for the data center Layer 2
solution?
A.MDC
and TRILL
B.SPBM
and VPLS
C.
SPBM and TRILL
D.VPLS and TRILL
Answer: A
Question: 6
A
company is using HP Network Visualizer to monitor traffic transmitted and
received by users in specific Active Directory user groups. The company wants
to send traffic to a different server from the controller and have that server
store the captured packets i n PCAP format. How would the network administrator
configure this solution to meet these requirements?
A.by
setting up a remote mirroring session
B.by setting the destination server's IP
address in the capture session
C. by setting up a managed remote destination
D.by
setting up a remote syslog server to receive controller log messages
Answer: B
Question: 7
Refer
to Exhibit:
The
switches in the exhibit are using SPBM. An administrator wants to send CustomerA
traffic directly over the new link, shown by the dotted line in the exhibit,as
a premium service for that customer. The existing links will be used for
backup. The new link is reserved for CustomerA traffic.
How
does the administrator set up Switch 1 to help to achieve this goal?
A.by
assigning the CustomerA interfaces and the specific links in the path to the
same S-VLAN ID
B.by creating a PW connection between
Switch 1 and Switch 3, and mapping the CustomerA service instance to that PW
C. by setting up a new B-VLAN and assigning it
to the new link and the backup links, and mapping the CustomerA l-SID to that
B-VLAN
D.by
changing the CustomerA l-SID 255 and defining the interface for the reserved
link as the priority path inl-SID 255
Answer: C
Test Information:
Total Questions: 60
Test Number: HPE0-Y53
Vendor Name: HP
Cert Name: HP Master ASE
Test Name: Building HPE SDN and FlexNetwork Solutions
Official Site: http://www.certsgrade.com
For
More Details: http://www.certsgrade.com/pdf/hpe0-y53/
Get20%
Immediate Discount on Full Training Mater
Discount Coupon Code: 20off2016
No comments:
Post a Comment